home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V11_0 / V11_075.ZIP / V11_075
Internet Message Format  |  1991-07-08  |  2KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/cZtBfSm00VcJ4:bE4z>;
  5.           Fri, 23 Feb 90 01:40:33 -0500 (EST)
  6. Message-ID: <QZtBfA600VcJQ-ZU4g@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Fri, 23 Feb 90 01:40:12 -0500 (EST)
  11. Subject: SPACE Digest V11 #75
  12.  
  13. SPACE Digest                                      Volume 11 : Issue 75
  14.  
  15. Today's Topics:
  16.            Payload Status for 02/21/90 (Forwarded)
  17. ----------------------------------------------------------------------
  18.  
  19. Date: 22 Feb 90 19:15:46 GMT
  20. From: trident.arc.nasa.gov!yee@ames.arc.nasa.gov  (Peter E. Yee)
  21. Subject: Payload Status for 02/21/90 (Forwarded)
  22.  
  23. Daily Status/KSC Payload Management and Operations 02-21-90
  24.        
  25.          
  26.  
  27. - STS-31R HST (at VPF) -
  28.  
  29. VPF closeout activities were worked yesterday including MLI    
  30. and velcro installations.  Closeouts will continue with   
  31. access platform removals today.
  32.  
  33.  
  34. - STS-32R SYNCOM/LDEF (at SAEF-2)
  35.        
  36. LDEF deintegration continues.          
  37.        
  38.  
  39. - STS-35 ASTRO-1/BBXRT (at O&C) -
  40.         
  41. BBXRT T-O checks were performed yesterday.  BBXRT clearance
  42. checks will be performed today.            
  43.  
  44.  
  45. - STS-40 SLS-1 (at O&C) -
  46.         
  47. The systems test was active yesterday and will continue today.      
  48. Experiment functional checks will also continue today.          
  49.       
  50.  
  51. - STS-42 IML (at O&C) -
  52.       
  53. Racks 3, 9, and 11 staging activities will continue today.  
  54.  
  55.  
  56. - STS-45 Atlas-1 (at O&C) -
  57.  
  58. Pallet 2 connector bracket installation along with pallet 2   
  59. and 3 hard point installations were performed yesterday.  
  60. Today pallet keel installation and orthogrid hard point
  61. installation operations will continue.
  62.  
  63.  
  64. - STS-46 TSS-1 (at O&C) - 
  65.  
  66. PPCU checkout will continue today.
  67.  
  68. ------------------------------
  69.  
  70. End of SPACE Digest V11 #75
  71. *******************
  72.